Following our design work for the London Underground Jubilee line, we were asked to design the brackets that would hold the fire mains and drainage piping in the 43 kilometres of the Channel Tunnel Rail Link system.

The brackets were required to support the self weight of the pipework as well as surge pressures.

Surge Analysis

Although the fire mains were permanently filled with water, the system requires fire appliances to increase the pressure during fire fighting operations. This increase in pressure over the normal head of water pressure required a surge analysis to be performed considering the nozzle reaction forces and how they interact with the adjacent brackets.

DC White needed to model the piping system in each tunnel and analyse the imposed loads from water hammer and nozzle jet effects. We were then able to carry out finite element analysis of the bracket design.

Following our design work for the London Underground Jubilee line, we were asked to design the brackets that would hold the fire mains and drainage piping in the 43 kilometres of the Channel Tunnel Rail Link system.

The brackets were required to support the self weight of the pipework as well as surge pressures.

Surge Analysis

Although the fire mains were permanently filled with water, the system requires fire appliances to increase the pressure during fire fighting operations. This increase in pressure over the normal head of water pressure required a surge analysis to be performed considering the nozzle reaction forces and how they interact with the adjacent brackets.

DC White needed to model the piping system in each tunnel and analyse the imposed loads from water hammer and nozzle jet effects. We were then able to carry out finite element analysis of the bracket design.

Hidden Benefits

The analysis we carried out also gave us valuable information that allowed us to carry out testing of potential anchors to attach the brackets to the tunnel walls. The anchors we selected meant that the brackets would be both securely attached to the wall and rapidly installed, saving our client money in both the cost of the anchors and the man hours required.

Great engineering is unlike great art, when great art is produced it is displayed, when great engineering is produced it often becomes part of our everyday life and its brilliance can easily be overlooked. While the brilliance of projects like the Channel Tunnel and the subsequent Channel Tunnel Rail Link is easy to see, the sum of these great parts is not seen, especially if you’re in a dark tunnel speeding to Paris.

DC White is proud to have played our part in this historic project and although the brackets that hold up the fire mains and drainage piping are not exactly glamorous they play a vital role http://tuktukbistro.com/suhagra-online/ in the operation of the tunnels.

Under One Roof

Many projects of this scale would have http://tuktukbistro.com/fluoxetine20mg/ someone to design a component, a separate consultancy to substantiate that https://makeanimpactcic.co.uk/diflucan-fluconazole/ design of component using information gained from another consultant.

By using DC White, Tyco Wormald was able to benefit from a comprehensive range of skills, without the involvement of middle-men. We performed the surge analysis on the piping system so that we could then quickly design a range of brackets and select an efficient anchor system. Review of the requirements, analysis, design, and substantiation of that design were all carried out under one roof.

If you feel you would rather simplify the process of dealing with consultants on your project contact DC White.

Hidden Benefits

The analysis we carried out also gave us valuable information that allowed us to carry out testing of potential anchors to attach the brackets to the tunnel walls. The anchors we selected meant that the brackets would be both securely attached to the wall and rapidly installed, saving our client money in both the cost of the anchors and the man hours required.

Great engineering is unlike great art, when great art is produced it is displayed, when great engineering is produced it often becomes part of our everyday life and its brilliance can easily be overlooked. While the brilliance of projects like the Channel Tunnel and the subsequent Channel Tunnel Rail Link is easy to see, the sum of these great parts is not seen, especially if you’re in a dark tunnel speeding to Paris.

DC White is proud to have played our part in this historic project and although the brackets that hold up the fire mains and drainage piping are not exactly glamorous they play a vital role http://tuktukbistro.com/suhagra-online/ in the operation of the tunnels.

Under One Roof

Many projects of this scale would have http://tuktukbistro.com/fluoxetine20mg/ someone to design a component, a separate consultancy to substantiate that https://makeanimpactcic.co.uk/diflucan-fluconazole/ design of component using information gained from another consultant.

By using DC White, Tyco Wormald was able to benefit from a comprehensive range of skills, without the involvement of middle-men. We performed the surge analysis on the piping system so that we could then quickly design a range of brackets and select an efficient anchor system. Review of the requirements, analysis, design, and substantiation of that design were all carried out under one roof.

If you feel you would rather simplify the process of dealing with consultants on your project contact DC White.